Anthem of CREC—“Trailbreaker”
On May 19, the main line of Dalian Metro Line 5 saw its two-way track-laying project completed by China Railway First Group Co., Ltd.

The undersea shield tunnel of Dalian Metro Line 5 is the world’s first large-diameter shield tunnel built through karst strata in a sea-area. With a total length of 2,882 meters, the project was regarded as an impossible task by top-notch construction experts. The section passing sea area measures 2,310 meters in length, with the lowest part of tracks in the undersea tunnel at 50 meters below the sea level. Altogether, 5,764 meters of the two-way rails were laid.
Track-laying Completed for World’s First Large-diameter Shi...
China Railway No.8 Engineering Group Contributes to Green De...
Tanzania President Attends Opening Ceremony of a 108-km High...
China Railway Academy Makes Two New World Top-level Research...
China’s First Permanent Magnetic Levitation Air Rail Set fo...
CREG, CREC-5 Launches First Large-diameter TBM for China's F...
CRHIC Develops and Launches Pile-beam Integrated Bridge Buil...
CREG's Shield Machines Exported to Portugal and Operated in ...
China Railway Electrification Engineering Group Kicks Off Co...
CREC-constructed 10th of Ramadan Railway Project in Egypt Pa...
China's First Homegrown Intelligent Maintenance Robot for Ra...
CTCE-constructed Mbanza Congo Water Supply System Enhancemen...
CREC-contributed Corporate ESG Disclosure Guide Group Standa...
CREC Takes Home International Bridge Conference Award
CREC Honored with Two New Fortune Awards and Crowned Excelle...
Contact Us
Address: China Railway Plaza, No.69 Fuxing Road, Haidian District, Beijing, P.R. China
Post Code: 100039E-mail: crecwebmaster@163.com
Fax: +86-010-51877688Web: http://www.sindbadvisa.com/english/1990/index.html
@ 1999-2019 CREC All Rights Reserved
