• <td id="egig0"><option id="egig0"></option></td>
  • <table id="egig0"><option id="egig0"></option></table>
  • <noscript id="egig0"><source id="egig0"></source></noscript>
  • <table id="egig0"></table>
    Padma Bridge, Bangladesh
    Source: Date:2022年06月20日

    Anthem of CREC—“Trailbreaker”

    孟加拉帕德瑪大橋

      In June 2018, the laying of initial steel girders of the Padma Bridge in Bangladesh was completed. In February 2019, the Tianyi crane ship of MBEC put the 3,000-ton steel beam frame onto the piers. In August 2021, after its first steel beam component was installed, the Ali Khan Bridge, the first steel girder bridge of the railway connection project, was completed. The Padma Bridge, dubbed the “dream bridge” by the people of Bangladesh, not only facilitates transport between 21 areas in southern Bangladesh and the capital of Dhaka, but also connects to the south end of the Pan-Asian Railway linking China and India, thus playing a pivotal role in deepening cooperation between China and South Asian countries. When completed, the bridge will put an end to the history of people depending on ferries to travel between the 21 areas in southern Bangladesh and the capital of Dhaka and serve as an important passage connecting to China and the Pan-Asian Railway.

    Print Close

    Contact Us

    Address: China Railway Plaza, No.69 Fuxing Road, Haidian District, Beijing, P.R. China

    Post Code: 100039E-mail: crecwebmaster@163.com

    Fax: +86-010-51877688Web: http://www.sindbadvisa.com/english/1990/index.html

    @ 1999-2019 CREC All Rights Reserved

  • <td id="egig0"><option id="egig0"></option></td>
  • <table id="egig0"><option id="egig0"></option></table>
  • <noscript id="egig0"><source id="egig0"></source></noscript>
  • <table id="egig0"></table>
    精品国产91乱码一区二区三区