Anthem of CREC—“Trailbreaker”
The world’s smallest-diameter shield tunneling machine independently developed by China Railway Engineering Equipment Group Co., Ltd (CREG) rolled off the assembly line on March 31 in Shanghai, China. With a diameter of 7.5 meters and atmospheric pressure cutter disk, the machine was named “Changtong” and will be used in the Yangtze River underwater tunneling project of the China-Russia East Route Natural Gas Pipeline. The project is the world’s largest through-river tunneling task in terms of single tunneling distance, digging depth, water pressure, and tunnel diameter. (By Sun Kaidi)
World's Smallest-diameter Shield Tunneling Machine Running w...
SCM's Second-phase Project of Mine Dressing System Succeeds ...
Main Structure of Banda Malaysia Utara MRT Station Completed...
China Railway Huida Provides Full Insurance for CREC’s Over...
SCM Registers Robust Performance in Q1 2021
More Than Half of the Tracks for Yuxi-Mohan Section of China...
Welding of 500-meter-long Rails along the Boten-Vientiane Se...
CREC Reports Its 2020 Annual Performance
China Railway No.9 Engineering Group Makes Major Progress in...
CREG Exports Large-diameter Hard Rock Tunnel Boring Machine ...
Foundation Stone Laid for Nepal's Water Diversion Project Un...
World's Longest Steel-concrete Composite Cable-stayed Bridge...
Track-laying Begins for China's Dali-Ruili Railway
‘Bridge Rotation’ Technology of Wuhan Branch of China Rail...
Continuous Beam Mid-span of the Longest Bridge on China-Laos...
Contact Us
Address: China Railway Plaza, No.69 Fuxing Road, Haidian District, Beijing, P.R. China
Post Code: 100039E-mail: crecwebmaster@163.com
Fax: +86-010-51877688Web: http://www.sindbadvisa.com/english/1990/index.html
@ 1999-2019 CREC All Rights Reserved
