• <td id="egig0"><option id="egig0"></option></td>
  • <table id="egig0"><option id="egig0"></option></table>
  • <noscript id="egig0"><source id="egig0"></source></noscript>
  • <table id="egig0"></table>
    Location: Home > News Update > News Update
    TBMs Start Excavating for MRT Phase II
    Source:CREC International Business Division Date:2019年04月04日

    Anthem of CREC—“Trailbreaker”

    TBMs starts excavating for MRT Phase II in Kuala Lumpur recently. The underground tunnel has the total length of 13.5 kilometers, undertaken by China Railway Orient International Group Co., Ltd., a subsidiary of CREC. It is a major engineering project in Malaysia.

    The Company exploits its integrated advantages, continuously implies modern management on international projects, and has achieved the earliest commencement of excavation, overcoming lots of unfavorable factors, such as complex geological conditions dynamic design and etc.

    Print Close

  • <td id="egig0"><option id="egig0"></option></td>
  • <table id="egig0"><option id="egig0"></option></table>
  • <noscript id="egig0"><source id="egig0"></source></noscript>
  • <table id="egig0"></table>
    精品国产91乱码一区二区三区

    Contact Us

    Address: China Railway Plaza, No.69 Fuxing Road, Haidian District, Beijing, P.R. China

    Post Code: 100039E-mail: crecwebmaster@163.com

    Fax: +86-010-51877688Web: http://www.sindbadvisa.com/english/1990/index.html

    @ 1999-2019 CREC All Rights Reserved