Anthem of CREC—“Trailbreaker”
The track laying work for Phonethong super major bridge, the longest bridge along the China-Laos railway, was completed on August 11. So far, only 2.3 kilometers of track-laying is left for the 422.4-kilometer main line of Boten-Vientiane section of the China-Laos railway, just one step away from opening of the whole line.

Phonethong super major bridge is located in Vientiane, Laos, with a length of 7528.56 meters. China Railway No.2 Engineering Group undertakes track laying.
Track-laying Completed for the Longest Bridge along China-La...
Construction Starts for the Ballastless Track High-speed Rai...
Major Breakthrough Made in Digging Gaoligong Mountain Rail T...
500-meter-long Rail Welded along the Vientiane-Boten Section...
China Successfully Develops Smart Locomotive for Installing ...
Main Bridge of Cross-sea Rail Bridge with the Highest Design...
π-type Steel-concrete Composite Beam with the Largest Span ...
Peljesac Bridge Joined Together, Witnessed by Croatian Prime...
CREC Ranks 35th on Fortune Global 500 List
CREC Ranks 5th on 2021 Fortune China 500 List
CREC Donates 10 Mln Yuan to Flood-hit Areas in Henan
Construction Started for China’s First Demonstration Line o...
CREC Fights for Flood Control and Disaster Relief in Henan
World's First 600 km/h High-speed Maglev Train Rolls Off the...
China's First All-steel Single-tower Asymmetric Cable-stayed...
Contact Us
Address: China Railway Plaza, No.69 Fuxing Road, Haidian District, Beijing, P.R. China
Post Code: 100039E-mail: crecwebmaster@163.com
Fax: +86-010-51877688Web: http://www.sindbadvisa.com/english/1990/index.html
@ 1999-2019 CREC All Rights Reserved
