• <td id="egig0"><option id="egig0"></option></td>
  • <table id="egig0"><option id="egig0"></option></table>
  • <noscript id="egig0"><source id="egig0"></source></noscript>
  • <table id="egig0"></table>
    Location: Home > Core Business > Investment
    Chengdu Metro Line 3 Project
    Source:CREC Date:2018年11月27日

    Anthem of CREC—“Trailbreaker”

    Phase I Project of Chengdu Metro Line 3 is “Investment & Financing + EPC + Repurchase”, with a total length of the line approximately 20.359 kilometers, all of which is underground lines. It starts from southwest at Hongpailou South Station to the north-west at Tianhuizheng South Station connecting 17 stations and including one vehicle depot (the northern suburbs vehicle depot). With a contractual investment of 6.9 billion CNY (approximately 1 billion USD), the project started in May 2012 and opened for trial operation in June 2016.

    Pouring Concrete to the Bottom Plate of Section 16 in Chengdu Metro Guangdu North Station

    Chengdu Metro Line 3 Project

     

     

    Print Close

  • <td id="egig0"><option id="egig0"></option></td>
  • <table id="egig0"><option id="egig0"></option></table>
  • <noscript id="egig0"><source id="egig0"></source></noscript>
  • <table id="egig0"></table>
    精品国产91乱码一区二区三区

    Contact Us

    Address: China Railway Plaza, No.69 Fuxing Road, Haidian District, Beijing, P.R. China

    Post Code: 100039E-mail: crecwebmaster@163.com

    Fax: +86-010-51877688Web: http://www.sindbadvisa.com/english/1990/index.html

    @ 1999-2019 CREC All Rights Reserved