Anthem of CREC—“Trailbreaker”
This bridge locates in Chittagong in the southeast of Bangladesh, it is the first cable-stayed road bridge in Bangladesh. It has a total length of 950m and the main bridge is a four-pylon extradosed bridge of pre-stressed continuous concrete girder with a main span of 200m carrying six carriageways in dual directions. The bridge deck is 25m wide. The bridge was commenced in July 2006 and completed in April 2011. MBEC designed and constructed the bridge.
.png)
Third Karnaphuli Bridge
Track-laying of Vientiane-Luang Prabang Section of China-Lao...
Record-setting Subsea Tunnel Completed
President of Sierra Leone Attends the Groundbreaking Ceremon...
CREC Awarded at the 6th China Grand Awards for Industry
The Second Bid Section of Cukaru Peki Copper-Gold Project in...
Vientiane-Luang Prabang Section of China-Laos Railway Comple...
CREC Once Again Wins Highest Award in Global Tunneling Secto...
Affiniam Dam Rehabilitation Project in Senegal Handed Over
Chinese New-type Isometric Tube OCS Masts Exported to Israel...
Mengyang Tunnel along the Yuxi-Mohan Section of China-Laos R...
Padma Bridge Rail Link Project in Bangladesh Makes New Progr...
CREC-built Padma Bridge in Bangladesh Finishes Closure
Main Structure of Luang Prabang Station along China-Laos Rai...
Longest Tunnel of China-Laos Railway Cut Through
Another Tunnel along Jakarta-Bandung High-speed Railway Cut ...
Contact Us
Address: China Railway Plaza, No.69 Fuxing Road, Haidian District, Beijing, P.R. China
Post Code: 100039E-mail: crecwebmaster@163.com
Fax: +86-010-51877688Web: http://www.sindbadvisa.com/english/1990/index.html
@ 1999-2019 CREC All Rights Reserved
