Anthem of CREC—“Trailbreaker”
The bridge over the Kirtonkhola River consists of the main bridge and two approach bridges over both sides. The total length of bridge is 1390m and the width is 10m. The span arrangement is: 12 spans of 30m simple supported I-beam + (48.5m+6 ×85.5m+48.5m) pre-stressed continuous concrete box girder with variable cross sections +14 spans of 30m simple supported I-beam. It was commenced in October 2006 and completed in December 2010.
.png)
Dapdapia Bridge
.jpg)
Papdapia Bridge
Track-laying of Vientiane-Luang Prabang Section of China-Lao...
Record-setting Subsea Tunnel Completed
President of Sierra Leone Attends the Groundbreaking Ceremon...
CREC Awarded at the 6th China Grand Awards for Industry
The Second Bid Section of Cukaru Peki Copper-Gold Project in...
Vientiane-Luang Prabang Section of China-Laos Railway Comple...
CREC Once Again Wins Highest Award in Global Tunneling Secto...
Affiniam Dam Rehabilitation Project in Senegal Handed Over
Chinese New-type Isometric Tube OCS Masts Exported to Israel...
Mengyang Tunnel along the Yuxi-Mohan Section of China-Laos R...
Padma Bridge Rail Link Project in Bangladesh Makes New Progr...
CREC-built Padma Bridge in Bangladesh Finishes Closure
Main Structure of Luang Prabang Station along China-Laos Rai...
Longest Tunnel of China-Laos Railway Cut Through
Another Tunnel along Jakarta-Bandung High-speed Railway Cut ...
Contact Us
Address: China Railway Plaza, No.69 Fuxing Road, Haidian District, Beijing, P.R. China
Post Code: 100039E-mail: crecwebmaster@163.com
Fax: +86-010-51877688Web: http://www.sindbadvisa.com/english/1990/index.html
@ 1999-2019 CREC All Rights Reserved
