Anthem of CREC—“Trailbreaker”
YJ900 Mobile Bridge Erection Machine is suitable for the erection of 20-meter-long, 24-meter-long and 32-meter-long double-line full-hole concrete box girder for passenger dedicated line in mountain areas. After the girder is loaded to precast yard by the machine, it will be transported to the erection position through the access road, roadbed, bridge and culvert.
.png)
YL900 Mobile Bridge Erection Machine
Track-laying of Vientiane-Luang Prabang Section of China-Lao...
Record-setting Subsea Tunnel Completed
President of Sierra Leone Attends the Groundbreaking Ceremon...
CREC Awarded at the 6th China Grand Awards for Industry
The Second Bid Section of Cukaru Peki Copper-Gold Project in...
Vientiane-Luang Prabang Section of China-Laos Railway Comple...
CREC Once Again Wins Highest Award in Global Tunneling Secto...
Affiniam Dam Rehabilitation Project in Senegal Handed Over
Chinese New-type Isometric Tube OCS Masts Exported to Israel...
Mengyang Tunnel along the Yuxi-Mohan Section of China-Laos R...
Padma Bridge Rail Link Project in Bangladesh Makes New Progr...
CREC-built Padma Bridge in Bangladesh Finishes Closure
Main Structure of Luang Prabang Station along China-Laos Rai...
Longest Tunnel of China-Laos Railway Cut Through
Another Tunnel along Jakarta-Bandung High-speed Railway Cut ...
Contact Us
Address: China Railway Plaza, No.69 Fuxing Road, Haidian District, Beijing, P.R. China
Post Code: 100039E-mail: crecwebmaster@163.com
Fax: +86-010-51877688Web: http://www.sindbadvisa.com/english/1990/index.html
@ 1999-2019 CREC All Rights Reserved
