Anthem of CREC—“Trailbreaker”
Maanshan Second Wastewater Treatment Plant is located at the middle section of Tianmen Avenue in Maanshan City. It covers an area of 10.34 hectares and has a service area of 15.7 square kilometers. The designed scale is 100,000 m3/d. The sewage treatment uses oxidation ditch process. The project was signed on May 18, 2008 and officially commercialized on July 1, 2008. The effluent water quality is better than the national first-level standard B, and most of the indicators meet the first-level standard A.
(2)(3).png)
Garden-style China Railway Maanshan Water Co., Ltd.
Track-laying of Vientiane-Luang Prabang Section of China-Lao...
Record-setting Subsea Tunnel Completed
President of Sierra Leone Attends the Groundbreaking Ceremon...
CREC Awarded at the 6th China Grand Awards for Industry
The Second Bid Section of Cukaru Peki Copper-Gold Project in...
Vientiane-Luang Prabang Section of China-Laos Railway Comple...
CREC Once Again Wins Highest Award in Global Tunneling Secto...
Affiniam Dam Rehabilitation Project in Senegal Handed Over
Chinese New-type Isometric Tube OCS Masts Exported to Israel...
Mengyang Tunnel along the Yuxi-Mohan Section of China-Laos R...
Padma Bridge Rail Link Project in Bangladesh Makes New Progr...
CREC-built Padma Bridge in Bangladesh Finishes Closure
Main Structure of Luang Prabang Station along China-Laos Rai...
Longest Tunnel of China-Laos Railway Cut Through
Another Tunnel along Jakarta-Bandung High-speed Railway Cut ...
Contact Us
Address: China Railway Plaza, No.69 Fuxing Road, Haidian District, Beijing, P.R. China
Post Code: 100039E-mail: crecwebmaster@163.com
Fax: +86-010-51877688Web: http://www.sindbadvisa.com/english/1990/index.html
@ 1999-2019 CREC All Rights Reserved
