Anthem of CREC—“Trailbreaker”
The total length of the Xiang'an Submarine Tunnel of Xiamen East Passageway is 8.69 kilometers, of which the length of submarine tunnel is about 6.05 kilometers and the span of waters is about 4.2 kilometers. As the first submarine tunnel in mainland China, its maximum depth is about 70 meters below sea level. Completed and opened to traffic in April 2012, it is a milestone in advancing the progress of tunnel construction technology in China and narrowing the gap with the advanced construction technology of the world's submarine tunnels. It has enhanced China's core competitiveness and innovation capability of participating in international tunnel construction and provided support and demonstration for many large submarine tunnel construction projects.
.png)
Xiang'an Submarine Tunnel of Xiamen East Passageway
Track-laying of Vientiane-Luang Prabang Section of China-Lao...
Record-setting Subsea Tunnel Completed
President of Sierra Leone Attends the Groundbreaking Ceremon...
CREC Awarded at the 6th China Grand Awards for Industry
The Second Bid Section of Cukaru Peki Copper-Gold Project in...
Vientiane-Luang Prabang Section of China-Laos Railway Comple...
CREC Once Again Wins Highest Award in Global Tunneling Secto...
Affiniam Dam Rehabilitation Project in Senegal Handed Over
Chinese New-type Isometric Tube OCS Masts Exported to Israel...
Mengyang Tunnel along the Yuxi-Mohan Section of China-Laos R...
Padma Bridge Rail Link Project in Bangladesh Makes New Progr...
CREC-built Padma Bridge in Bangladesh Finishes Closure
Main Structure of Luang Prabang Station along China-Laos Rai...
Longest Tunnel of China-Laos Railway Cut Through
Another Tunnel along Jakarta-Bandung High-speed Railway Cut ...
Contact Us
Address: China Railway Plaza, No.69 Fuxing Road, Haidian District, Beijing, P.R. China
Post Code: 100039E-mail: crecwebmaster@163.com
Fax: +86-010-51877688Web: http://www.sindbadvisa.com/english/1990/index.html
@ 1999-2019 CREC All Rights Reserved
