• <td id="egig0"><option id="egig0"></option></td>
  • <table id="egig0"><option id="egig0"></option></table>
  • <noscript id="egig0"><source id="egig0"></source></noscript>
  • <table id="egig0"></table>
    Location: Home > News Update > News Update
    World’s First Double-deck Cable-stayed Suspension Bridge Starts Construction
    Source: Date:2022年01月11日

    Anthem of CREC—“Trailbreaker”

      The G2 Tongling Yangtze River Road-Rail Bridge, the world’s first double-deck cable-stayed suspension bridge, began construction on January 4. The bridge was designed by China Railway Major Bridge Reconnaissance & Design Institute and constructed by the China Railway Major Bridge Engineering Group.

    圖片1

      Ground breaking of the bridge

      The bridge, with a major span of 988 meters, is designed with a cable-stayed suspension structure. With a total length of 11.88 km, it will serve as an expressway, inter-city railway and freight railway after completion.

    圖片2

      A rendering of the bridge

    Print Close

  • <td id="egig0"><option id="egig0"></option></td>
  • <table id="egig0"><option id="egig0"></option></table>
  • <noscript id="egig0"><source id="egig0"></source></noscript>
  • <table id="egig0"></table>
    精品国产91乱码一区二区三区

    Contact Us

    Address: China Railway Plaza, No.69 Fuxing Road, Haidian District, Beijing, P.R. China

    Post Code: 100039E-mail: crecwebmaster@163.com

    Fax: +86-010-51877688Web: http://www.sindbadvisa.com/english/1990/index.html

    @ 1999-2019 CREC All Rights Reserved