• <td id="egig0"><option id="egig0"></option></td>
  • <table id="egig0"><option id="egig0"></option></table>
  • <noscript id="egig0"><source id="egig0"></source></noscript>
  • <table id="egig0"></table>
    Location:Home?>?detail
    Location: Home > Core Business > Investment
    Phase I Project of Chongqing Rail Transit Line 5
    Source:CREC Date:2018年11月27日

    The total length of the line is 39.75 kilometers including approximately 31.18-kiolemeter underground line, approximately 2.12-kilometer elevated line and 450-meter open sector and ground line. It has 25 stations and the total investment is approximately 20 billion CNY (2.88 billion USD). 

    Phase I Project of Chongqing Rail Transit Line 5

     

    Print Close

  • <td id="egig0"><option id="egig0"></option></td>
  • <table id="egig0"><option id="egig0"></option></table>
  • <noscript id="egig0"><source id="egig0"></source></noscript>
  • <table id="egig0"></table>
    精品国产91乱码一区二区三区