• <td id="egig0"><option id="egig0"></option></td>
  • <table id="egig0"><option id="egig0"></option></table>
  • <noscript id="egig0"><source id="egig0"></source></noscript>
  • <table id="egig0"></table>
    Location:Home?>?detail
    Chengdu Metro Line 3 Project
    Source:CREC Date:2018年11月28日

    Phase I Project of Chengdu Metro Line 3 is implemented in the mode of “Investment & Financing + EPC + Repurchase”. The total length of the line is about 20.359 kilometers, which is from southwest to northeast. It starts at Hongpailou South Station and ends in Tianhuizheng South Station. There are 17 stations and 1 vehicle depot (the northern suburbs vehicle depot), all of which are underground lines. With a contractual investment of 6.9 billion yuan, the project started in May 2012 and opened for trial operation in June 2016.

    Chengdu Metro Line 3 Project

     

    Print Close

  • <td id="egig0"><option id="egig0"></option></td>
  • <table id="egig0"><option id="egig0"></option></table>
  • <noscript id="egig0"><source id="egig0"></source></noscript>
  • <table id="egig0"></table>
    精品国产91乱码一区二区三区