• <td id="egig0"><option id="egig0"></option></td>
  • <table id="egig0"><option id="egig0"></option></table>
  • <noscript id="egig0"><source id="egig0"></source></noscript>
  • <table id="egig0"></table>
    Location:Home?>?detail
    Dayaoshan Tunnel
    Source:International Business Division Date:2018年11月27日

    With a total length of 14 kilometers, Dayaoshan Tunnel of Hengyang-Guangzhou Railway, started in 1981 and completed in 1989, at which time it was the longest electrified double-track railway tunnel in China. CREC independently built the entire tunnel and applied the New Austrian Tunneling Method for the first time to build long mountain railway tunnel and won the National Science and Technology Advancement Award.

    Daoyaoshan Tunnel

     

    Print Close

  • <td id="egig0"><option id="egig0"></option></td>
  • <table id="egig0"><option id="egig0"></option></table>
  • <noscript id="egig0"><source id="egig0"></source></noscript>
  • <table id="egig0"></table>
    精品国产91乱码一区二区三区