• <td id="egig0"><option id="egig0"></option></td>
  • <table id="egig0"><option id="egig0"></option></table>
  • <noscript id="egig0"><source id="egig0"></source></noscript>
  • <table id="egig0"></table>
    Location:Home?>?detail
    Qinhuangdao-Shenyang Passenger Dedicated Line
    Source:International Business Division Date:2018年11月27日

    Qinhuangdao-Shenyang Passenger Dedicated Line is the first two-line electrified high-speed railway independently designed and constructed by Chinese enterprise. Started in 1999 and completed in 2002, it is approximately 404-kilometer-long. CREC independently built approximately 60% of the project which has won the Luban Award for Construction Project.

    Laying Track of Qinhuangdao-Shenyang

     

    Print Close

  • <td id="egig0"><option id="egig0"></option></td>
  • <table id="egig0"><option id="egig0"></option></table>
  • <noscript id="egig0"><source id="egig0"></source></noscript>
  • <table id="egig0"></table>
    精品国产91乱码一区二区三区